Chapter 10
Preliminary
Cost Estimates
Background
CPW
developed a list of cost estimates for project recommendations. The cost
estimates are intended to help the City plan and budget for park improvements as
population grows. These project estimates are preliminary but are meant to
provide a general estimate of costs for budgeting purposes. The Parks Capital
Improvement Plan (CIP) consists of the project description, estimated project
cost, and project priority (to be determined by the Parks and Recreation Board).
The Parks Capital Improvement Plan will be integrated into the overall Canby
Capital Improvement Plan when appropriate during the City budgeting process.
Methodology
CPW
consulted with other communities and public agencies in order to develop a
comprehensive estimate of costs for Canby’s Parks Capital Improvement Plan.
Where costs are more than one year old, we made adjustments for inflation.
As this document ages staff will have to continue to adjust costs as necessary.
Limitations
There
are a significant number of limitations involved in gathering cost estimates for
park and recreation development.
·
Because
detailed site designs for features such as trail and sidewalk length, feet of
irrigation, and so on, will be developed in the future, quantities are highly
generalized. Such design details depend on further planning and public input
after the Park and Recreation Master Plan recommendations are approved.
·
Trail
building, site preparation, surfacing and irrigation are the most difficult to
estimate accurately without site-specific details. Accurate cost estimates are
dependent on site-specific variables.
·
Site preparation cost estimates are not included,
because they require significant technical expertise and on-site consulting.
Such level of detail is outside of CPW’s scope of work and should take place
later in the process. In many cases, this will require the involvement of
landscape architects and engineers.
·
Where
recommended, new development will occur on publicly owned land,
so land value is not included in cost estimates. Nonetheless,
land value should be factored into the true cost of site development.
Cost estimates are intended to be general
guidelines for establishing priorities, staffing levels and budgeting.
Before any recommendations are implemented, the City should re-evaluate
these figures with more detailed site-specific cost estimates.
Per Item Costs
When
gathering cost estimates, CPW found a wide range of prices for different
facilities and equipment. CPW tried to gather cost estimates for modest
equipment from vendors and contractors known for high quality and durable
products, preferably in Oregon.
In
accordance with recommendation Goal 2, “Move
towards standardized park and recreation amenities for ease of maintenance
and aesthetics,” CPW gathered estimates for facilities
similar to those in Locust
Street
Park
.
In general, Locust
Street
Park’s
facilities are attractive and of high quality.
Table 10-1 shows Locust
Street
Park’s
development cost breakdown. Costs are from 1995 and are adjusted
for inflation.
Table
10-1
Common
Park
Amenities
Price List
| Amenity |
Description |
Price Range |
Source |
| Design |
Architecture and Engineering |
10-15% of project cost |
City of Gresham
and other phone interviews1 |
| Basic
Park Furnishings |
| Benches |
Recycled plastic with metal supports |
$540+sh |
Locust
Street
Park
|
| Picnic Tables |
Recycled plastic with metal supports |
$540-$864 + shipping |
Northwest Recreation |
| Garbage Can & Holders |
Pole-mounted plastic cans |
$432 |
Locust
Street
Park
|
| Drinking Fountains
|
Disabled accessible, higher price for frost-free model
|
$1,944 |
Northwest Recreation |
| Raised Picnic Grills |
Cast-iron firebox, 272 sq. inch; adjustable grate, embedded
steel post |
$323 |
Kerr’s Cost Data for Landscape construction |
| Park Signs (entrance) |
Cost varies widely depending on size |
$756 - $1,296 |
Northwest Recreation |
| Structures
|
| Covered Picnic Areas
|
Depends on size, does not include installation
|
$16,200-$37,800 |
Northwest Recreation |
| Rest rooms: |
|
|
|
| Basic Portable
ADA
compliant portable |
Portable Prices include weekly servicing |
$82/mo.- $157/mo. |
Clinkscales-Molalla |
| Unisex with urinal |
|
$28,080 |
|
| Standard one toilet/sink each |
Standard facilities include installation costs |
$37,800 |
Restroom Facilities |
| Infrastructure
|
| Parking Lots |
Approximately 40 spaces, 10,000 sq. ft. @ $2.25/sq.ft. |
$24,300 |
Parker Northwest |
| Trail development and gravelling |
Prices vary widely, accurate estimates require site visit |
$28,512 to $108,000/ mile |
Parker Northwest/Gresham |
| Sidewalks |
Asphalt concrete paving, 3” thick on 4”
base, over 1,000 sq. ft. |
$31/ sq. yard |
Kerr’s Cost Data for Landscape construction |
| Irrigation |
For commercial freezing areas |
$7,435/ acre |
Kerr’s Cost Data for Landscape construction |
| Play Equipment |
| Fountain/toddler pool |
Includes equipment and construction |
$19,440-32,4002 |
Hall Fountains |
| Toddler Playground |
Locust
Street
Park |
approx. $31,320 |
Landscape Structures, Inc. |
| Children’s Playground |
Locust
Street
Park |
approx. $31,320 |
Landscape Structures, Inc. |
| Recreation
Facilities |
| Tennis Courts |
2 courts, park grade installed including nets, posts, fencing
and painting |
$51,840 |
Atlas Tracks |
| Outdoor Volleyball |
Includes nets, posts, ground sleeves, footings. Does not
include installation |
$540 |
Northwest Recreation |
| Soccer Field |
Includes grading and goals; varies depending on whether seeded
or sodded |
$17,172 - $43,848
|
Kerr’s Cost Data for Landscape construction |
| Baseball Field |
Includes grading and backstop; varies depending on whether
seeded or sodded |
$20,412 - $47,844
|
Kerr’s Cost Data for Landscape construction |
| Swimming Pool |
Total project cost, 5,000 sq. ft. outdoor pool; median
estimate |
$499,770 |
Kerr’s Cost Data for Landscape construction |
| Lighting |
| Parking Lot Lighting
|
Steel poles; 20-30 ft. high |
$7,560 - $9,936 |
Kerr’s Cost Data for Landscape construction |
| Sports Field Lighting |
Steel poles; 45’ high |
$15,336 |
Kerr’s Cost Data for Landscape construction |
| Tennis Court Lighting |
Two court battery |
$13,608 |
Kerr’s Cost Data for Landscape construction |
| Site and Walkway Lighting |
Ornamental poles; 10-15 ft. high |
$5,594 - $6,696
|
Kerr’s Cost Data for Landscape construction |
Source:
Community Planning Workshop 2000
1CPW research indicates park design costs average
between 10% and 15% of the total project cost. The
Locust
Street
Park
development budget shows a significantly lower figure, which may not reflect a
full range of design related costs, such as community input measures.
2
Hall Fountains representatives estimate maintenance costs of about $54/month
and electricity costs of $27/month when in use.
Parks Capital Improvement Plan
Not
all recommendations made for the Canby parks system are for specific projects.
Some recommendations are better described as goals and objectives. Goals are
broad-based statements that provide a future vision for how parks should look.
Objectives are potential approaches for reaching overall goals. Objectives tend
to be less broad than goal statements and there may be more than one objective
to satisfy a particular goal.
Lastly,
projects are particular improvements that are specified to achieve
the goal, or future vision of how parks should look. Projects typically
include an identified piece of property and are highly detailed.
Table 10-2 shows the recommendations from Chapter 9 that represent
goals rather than actual recommended projects. These goals pertain
to improvements, new park and recreation development, and maintenance
and operations. Table
10-2
Recommendations Resulting in Goals
|
Improvement
and Maintenance Goals:
|
|
Goal
1:
Improve level of maintenance in current city parks and recreation
facilities.
|
|
Goal
2: Move towards standardized park and recreation facilities for ease of
maintenance and aesthetics.
|
|
Goal
3: Improve park and recreation signage for identification and direction.
|
|
Goal
4: Improve universal access.
|
|
Goal
5: Improve perception of safety in Canby’s parks and recreation
facilities.
|
|
New
Park and Recreation Development Goals:
|
|
Goal
6: Develop 141.2 additional
acres of park and recreation facilities over the next 20 years to meet
the community standard of 10 acres of developed parkland per 1,000
residents.
|
|
Goal
7: Allocate land for
neighborhood parks in rapidly developing areas on edges of city.
|
|
Goal
8: Use the map generated in
the August 2000 Community Forum (Figure 9-1) that identifies Canby
Transportation System Plan recommendations and recommended bike and
multi-use trails as a conceptual planning tool to identify potential
trail connections and linkages (i.e., the “Emerald Necklace”
concept) to schools, parks and other recreational sites in the Canby
vicinity.
|
|
Goal
9: Develop bike lanes
identified in the Canby Transportation System Plan to connect bicyclists
to parks, natural areas and off-road bicycling opportunities like the
Logging Road Trail.
|
|
Goal
10:
Partner with
Clackamas
County
and/or state agencies and private property owner(s) to connect ECO
Park/Logging Road Trail with the
Molalla
River
State Park
via a multi-use trail.
|
|
Goal
11: Develop a hub for Canby
in cooperation with Canby Business Revitalization and the Chamber of
Commerce.
|
|
Goal
12: Develop a systematic
connection between the
Willamette
River
and Canby.
|
|
Operations
Goals:
|
|
Goal
13: The City should continue
to work with recreation partners and volunteers to program special
events or festivals within the Canby area.
|
|
Goal
14: Utilizing recreation partners and volunteers, increase publicity of
services and activities offered to the public at the
Adult
Center
,
Swim
Center
and other park and recreation facilities.
|
|
Goal
15: Identify needs of and better serve the Hispanic community.
|
|
Goal
16:
Continue to work cooperatively with the Blue Heron Recreation
District to provide park and recreation facilities and services to
Canby-area residents. Explore opportunities to increase community
support for park district funding.
|
|
Goal
17: Establish a park
foundation /funding arm of the Parks Department
|
|
Goal
18: Continue to partner with
Canby
Schools
and State and local agencies and organizations to restore the wetland
and riparian areas in Canby’s
Community
Park
and other protected open space areas to provide high quality wildlife
habitat and provide nature-based recreational and educational
experiences to the community.
|
Source:
City of Canby
and Community Planning Workshop (2000)
Table
10-3 represents the Capital Improvement Plan for the Canby parks and recreation
system. The Parks Capital Improvement Plan includes only specified projects, and
not park goals.
Table
10-3 lists each project, its estimated cost and the project priority. The Parks
and Recreation Board will determine project priority. The costs listed in Table
10-3 are broad, yet they give an idea of project scope and allow the City to plan
for each project and to wisely allocate resources.
Table
10-3
Parks Capital Improvement Plan
|
Project |
Estimated Cost |
Priority |
|
Project 1: Develop
an Acquisition Plan and policies to be incorporated into the Canby
Parks Master Plan.
|
$20,000 - $40,000
|
|
|
Project 2: Develop
Phase II of the Canby
Regional
Park
with multiple sports fields, lighting for nighttime play, and
a dual-use parking area.
|
$1,000,000 |
|
|
Project 3: Develop
the 13th Avenue
Park site as a neighborhood park with a variety of activities
for area residents of all ages, possibly as part of a proposed
recreation complex in partnership with the
Canby
School
District . |
$791, 200 |
|
|
Project 4: Develop
the Eco
Park
site as a nature park for recreation and nature enjoyment, possibly
in conjunction with the newly acquired extension of the Logging
Road Trail.
|
$145,000 |
|
|
Project 5: Acquire,
protect, and restore the Molalla River Greenway on Canby Utilities
property connecting Canby
Community
Park
to Knight’s Bridge with a trail system, benches, and river access.
|
$275,000 |
|
|
Project 6: Build a new swimming pool.
Explore site options for locating new pool facility.
Explore new programming/revenue options that a second body
of water may present |
$5-10 million |
|
|
Project 7: Develop
currently owned public property designated for parks, recreation
and open space as opportunities arise.
|
$1.6 million |
|
|
Project 8: Investigate
additional natural areas, view sheds, and parkland via a Parks
Acquisition Plan.
|
$15,000 -$25,000
|
|
|
Grand Total |
$8.3-$13.4 million
|
|
Source:
City of
Canby
and Community Planning Workshop (2000)
This
Parks Capital Improvement Plan contains approximate costs for each
of the specific recommended projects. These figures will be modified
in the future when more detailed project planning takes place. Accurate
project costs will ensure Canby of efficiently planning and allocating
resources as each project is implemented.
Return
to Parks Master Plan table of contents
|